This website uses cookies
More information
Navigate directly to favourite company, aircraft and sector pages with our tracker feature.

PRESS RELEASE
Issued by:

GA-ASI completes full-scale fatigue test on MQ-9B for second lifetime
Monday, 14 October 2024

On Sept. 30, 2024, General Atomics Aeronautical Systems, Inc. (GA-ASI) completed a major milestone with the full-scale fatigue testing of an MQ-9B Remotely Piloted Aircraft (RPA). The team completed the “second lifetime” of fatigue testing, which is equivalent to 80,000 operating hours and represents an important step in validating the design of the airframe system. The testing is part of the aircraft certification to NATO standard STANAG 4671, where the aircraft will ultimately be tested through three lifetimes, thereby proving the 40,000-hour lifetime of the airframe.

The full-scale fatigue test simulates the aircraft’s design service through the application of repeated structural loading on the assembled airframe. The testing identifies any potential structural deficiencies ahead of fleet usage and assists in developing inspection and maintenance schedules for the airframe. The results of the test will be used as part of the documentation for certification and will form the basis for in-service inspections of structural components.

MQ-9B is GA-ASI’s most advanced RPA and includes the SkyGuardian and SeaGuardian models as well as the new Protector RG Mk1 that is currently being delivered to the United Kingdom Royal Air Force (RAF).

“Full-scale fatigue testing is an integral part of validating the airframe design and a key input for the certification of the airframe prior to entering service,” said Chris Dusseault, vice president of MQ-9B in Europe. “The completion of the fatigue test builds confidence for our MQ-9B customers that the SkyGuardian/SeaGuardian meets the stringent design rigor and is mature at Entry into Service.”

The testing is the validation of years of design and analysis efforts. This is the second of three lifetimes of testing for the airframe. Two of the lifetimes simulate the operation of an aircraft under normal conditions, and the third has intentional damage inflicted on the airframe’s critical components to demonstrate its resistance to operational damage that may occur over the lifetime of the air vehicle.

Testing was conducted from Jan. 31, 2024, through Sept. 30, 2024, at Wichita State University’s National Institute for Aviation Research in Wichita, Kansas. The airframe tested is a production airframe purpose-built to support the test campaign.

In addition to the RAF, contracts have been signed for MQ-9B with Belgium, Canada, Japan, Taiwan and the U.S. Air Force in support of the Special Operations Command. The Japan Coast Guard is currently operating the SeaGuardian for maritime operations, and the Japan Maritime Self-Defense Force (JMSDF) selected SeaGuardian for its Medium-Altitude, Long-Endurance (MALE) RPA System Trial Operation Project.

Contact details from our directory:
General Atomics Aeronautical Systems (GA-ASI) Airframer
National Institute for Aviation Research (NIAR WSU) Certification Services, Fatigue Testing, Computer-aided Testing, Prototyping, Aerodynamic Test Services, Composite Testing Services, Corrosion Testing Services, Fracture Testing Services, Non-Destructive Testing, Inspection Service, Electromagnetic Test Services, Environmental Testing Services, Stress Analysis, Computer-aided Design, Additive Manufacturing, Lightning Testing, Data Analysis, Ultrasonic Testing, Vibration Testing, X-Ray Equipment
Related aircraft programs:
General Atomics MQ-9
Related directory sectors:
Test Services