Airbus A220 |
Analysis |
Tooling: Final assembly line tooling |
Airbus A380 |
Analysis |
Drilling Equipment: Section 19 circumferential drilling machines; Tooling: Automated turnkey tooling for rear fusealge Section 19 assembly |
BETA ALIA |
Analysis |
Tooling: Automated equipment and precision tooling for primary structure assembly |
Boeing 787 Dreamliner |
Analysis |
Drilling Equipment: Circumferential & automated drilling machines; Plant Automation Equipment: Automated assembly systems; Remote Positioning Systems: Automated positioning system for section-to-fuselage joins; Work Platforms: Horizontal stabilizer/HVA installation tool subassembly platforms; Mandrels: Section 41 mandrel assembly & disassembly systems for Spirit AeroSystems |
Boeing F/A-18 Super Hornet |
Analysis |
Drilling Equipment: Turnkey automated drilling system for outer wing assembly |
Boom Overture |
Analysis |
Drilling Equipment: (Overture); Tooling: Tooling for final assembly line (Overture) |
COMAC C919 |
Analysis |
CIM Systems: Five cell final assembly line |
Lockheed Martin F-35 Lightning II |
Analysis |
Remote Positioning Systems: Electronic mate & assembly system |